A Numerically Controlled Milling Machine: Final Report to the US Air Force on Construction and Initial Operation: Part 2 Appendix III
Description
Final report to the US Air Force, Contract AF33(038)-24007. Part 2, Appendix III, containing engineering drawings and wiring diagrams.